I've never been able to brag about how big my hands are so I knew finding a nice set of grips was going to be tuff. Luckily, my friends over at Joker Machine offered these super compact billet grips for my less than manly paws. They measure 4 3/4" which is just the right size. Install looks to be fairly simple with a total of 3 set screws working to secure them in place.
Thursday, April 29, 2010
Tuesday, April 27, 2010
Benchmark Set
Kim @ Benchmark hooked me up with this beautiful breather for my build. He is making these sweet looking units for all different types of scooters. Check out his site for other cool billet bits and pieces.
Monday, April 26, 2010
Friday, April 23, 2010
Before and After
Wednesday, April 21, 2010
Back on it
I'm not one to get discouraged easily, but building this motorcycle has tested my patience and determination. My motor build started as a projected 3 week project and is now creeping up on the 7th week. Engine paint took 1 more week than expected, but I have been battling with the guys @ Rev Performance to get the correct pistons for about 5 weeks now. They finally butterfly cut my pistons and I hope to get my motor fully assembled with no more delays this weekend.
Aside from my heartache I did get back on top of the aesthetics this week. The steering stops got flap disced, hand filed, and sanded to remove the steering stops and I also got the throttle and mirror turned down on the lather to work with my Keystones.
The bars will be getting cut down by two inches on either side and prepped for mirror and throttle install this weekend as well. Look for a much happier Mike D. after this weekend.
Aside from my heartache I did get back on top of the aesthetics this week. The steering stops got flap disced, hand filed, and sanded to remove the steering stops and I also got the throttle and mirror turned down on the lather to work with my Keystones.
The bars will be getting cut down by two inches on either side and prepped for mirror and throttle install this weekend as well. Look for a much happier Mike D. after this weekend.
Monday, April 19, 2010
Monday, April 12, 2010
Monday, April 5, 2010
Saturday, April 3, 2010
Gettin' Heads
Andrew @ Rev Performance came through with flying colors. They got my heads, relieved the chambers, installed bigger valves, and had them sent back to me within 48 hours so I could make sure to get my motor back together this weekend and stay on schedule.
Thursday, April 1, 2010
Close
Subscribe to:
Posts (Atom)